article image Blucher Press-Fit System

Luggage Point is one of several sites used for the $2.5 billion dollar Western Corridor Recycle Water Treatment Project. The project is the third largest water recycled project in the world. The Blucher Australia Blucher Press-Fit Pipe system is used on three sights in this giant project, Bundamba Advanced Water Treatment Plant, Gibson Island Advanced Water Treatment Plant and the Luggage Point Plant.

Time was a major player in choosing the Blucher Press-Fit pipe system for the Luggage Point Advanced Water Treatment Plant. The Luggage Point Alliance was after a product that allowed them to use various trades to install the piping and lack of pipe fitters to install all the lines was problematic.

With previous experience with the recommendation of the Blucher Press-Fit pipe system in the Western Corridor Recycle Water Project, The Mechanical Superintendent for Luggage Point was confident in involving the pipe system again.